The PDU3EVN6H50B 14.5kW 3-Phase Monitored PDU provides real-time remote monitoring of voltage, frequency and load levels via built-in network connection. Recommended for IT and industrial applications, it features 48 outlets—42 C13, 6 C19—with included plug-lock insert sleeves to prevent cables from becoming accidentally disconnected. A six-foot cord with Hubbell CS8365C input plug connects the 3-phase PDU to a compatible AC power source, generator or protected UPS.The built-in Java-free HTML5-based LX Platform network interface enables full remote access for PDU status monitoring and email notifications via secure web browser, SNMP, telnet or SSH. It supports 10/100 Mbps auto-sensing for optimum communication with an Ethernet network. Optional EnviroSense2 modules (sold separately) provide a variety of environmental monitoring capabilities. Protocols supported include IPv4, IPv6, HTTP, HTTPS, SMTP, SNMPv1, SNMPv2, SNMPv3, telnet, SSH, FTP, DHCP and NTP.A color touchscreen LCD lets you toggle between menus to monitor input current level per phase and output current per load bank with ±1% billing-grade accuracy, environmental sensor data and network information. It also generates a unique QR code to allow access to the PDU through a mobile device.The 0U PDU mounts vertically in racks using the included toolless mounting buttons or the included rack-mounting brackets. Use the included PDUMVROTATEBRKT kit to install the unit with outlets facing the rear for better airflow or equipment access.
Tripp Lite PDU ATS/Monitored 120V 1.44kW 15A 8 5-15R Dual 5-15P 12ft Cords - Metered Auto Transfer Switch - NEMA 5-15P - 8 x NEMA 5-15R - 120 V AC - 1U - Horizontal - Rack-mountable, Wall-mountable - TAA Compliant - TAA Compliance
208/230V Switched Power Distribution Unit / rack PDU (rPDU) with built-in web/network interface (12A 208V and 10A at 230V)C14 power inlet accepts a wide variety of worldwide input cord optionsIncludes 6.5 ft. / 2m C14 cable1U horizontal rackmount form factor8 switched C13 outletsSupports power-on, power-off or reboot of each outlet on a real-time or programmable basisEnables reboot of locked equipment, custom power-on/power-off sequences, load-shedding of optional loads and disabling unused outletsPre-installed WEBCARDLX with the latest version of PowerAlert Device Manager firmware (PADM20) provides enhanced remote management capabilitiesPADM20 and PowerAlert Element Manager (PAEM) form a powerful tool for expanding maintenance functions in large installations, including firmware update checks and backup and restoration of device configurationsIP-based Auto Probe detects lost connectivity and restores service autonomouslyIn-rack environmental reporting with optional temperature, humidity and contact-closure sensor options10/100 Mbps auto-sensingIncluded cord retention brackets keep vital network equipment plugged in and continuously powered
Tripp Lite PDU Monitored Horizontal 5.8kw 208/240V L6-30R 2 L6-30P ATS 1URM - NEMA L6-30P - 1 x NEMA L6-30R - 230 V AC - 1URack-mountable - TAA Compliance
Tripp Lite PDU Metered ATS 2/2.4KW 200/240V 10 C13 2 C14 3.6M Cords 1URM - IEC 60320 C14 - 10 x IEC 60320 C13 - 200 V AC, 208 V AC, 220 V AC, 230 V AC, 240 V AC - 2.40 kVA - 1U/2U - Horizontal Rackmount
Single-Phase 20A ATS rack PDU (rPDU) Distributes and Monitors Network-Grade Power in Real TimeThis monitored PDU provides real-time remote monitoring of voltage, frequency and load levels via its built-in network interface. Ideal for network IT applications, small computer rooms and other equipment rack applications, the PDUMNH20HVAT1 features eight C13 and two C19 200–240V outlets for connecting equipment. Dual 12-foot (3.7-meter) power cords with C20 inputs connect to separate primary and secondary mains circuits, backup generators, UPS systems or utility power grids, including out-of-phase sources. Switches from Primary to Secondary Power Source in MillisecondsAutomatic transfer switching (ATS) allows the PDU to switch to the secondary source within 2–7 milliseconds, should the primary source fail or become unstable, to ensure your connected equipment operates without interruption. An on-board ATS processor constantly evaluates the power quality of both input sources. It prevents switching if the secondary source is unavailable or of lower quality than the primary source.Pre-Installed WEBCARDLX Network Interface Offers 24/7 Remote Access for Monitoring and ControlThe HTML5-based WEBCARDLX network interface enables full remote access for PDU status monitoring and email notifications via secure web browser, SNMP, telnet or SSH. The latest version of PowerAlert Device Manager (PADM20) provides enhanced remote management capabilities, including customizable dashboard graphs to fit user preferences. The PADM20 upgrade and PowerAlert Element Manager (PAEM) form a powerful tool for expanding maintenance functions in large installations, including firmware update checks and backup and restoration of device configurations.Digital Load Meter Helps Prevent Potentially Expensive OverloadsA digital ammeter reports the total load for all connected equipment. Monitoring amperage helps ensure load levels remain well below maximum capacity with no danger of overload that could lead to costly downtime or damaged equipment. Maintaining proper load levels, even while adding new equipment, can keep your TCO (total cost of ownership) low.Mounts into 1U of Rack SpaceUse the included mounting hardware to install the all-metal housing into 1U of space in an EIA-standard 19-inch rack.TAA-Compliant for GSA Schedule PurchasesThe PDUMNH20HVAT1 is compliant with the Federal Trade Agreements Act (TAA), which makes it eligible for GSA (General Services Administration) Schedule and other federal procurement contracts.
Single-Phase 15A ATS PDU Distributes and Monitors Network-Grade Power in Real TimeThis metered PDU provides real-time local reporting of the total load level via its built-in digital current metering. Ideal for network IT applications, small computer rooms and other equipment rack applications, the PDUMH15ATS features eight NEMA 5-15R 120V outlets for connecting equipment. Dual 12-foot (3.7-meter) power cords with NEMA 5-15P inputs connect to separate primary and secondary mains circuits, backup generators, UPS systems or utility power grids, including out-of-phase sources.Switches from Primary to Secondary Power Source in MillisecondsAutomatic transfer switching (ATS) allows the PDU to switch to the secondary source within 2–7 milliseconds, should the primary source fail or become unstable, to ensure your connected equipment operates without interruption. An on-board ATS processor constantly evaluates the power quality of both input sources. It prevents switching if the secondary source is unavailable or of lower quality than the primary source.Digital Load Meter Helps Prevent Potentially Expensive OverloadsA digital ammeter reports the total load for all connected equipment. Monitoring amperage helps ensure load levels remain well below maximum capacity with no danger of overload that could lead to costly downtime or damaged equipment. Maintaining proper load levels, even while adding new equipment, can keep your TCO (total cost of ownership) low.Mounts into 1U of Rack Space or on a WallUse the included mounting hardware to install the all-metal housing into 1U of space in an EIA-standard 19-inch rack. You may also use the mounting brackets to secure the PDU to a wall or under a counter.TAA-Compliant for GSA Schedule PurchasesThe PDUMH15ATS is compliant with the Federal Trade Agreements Act (TAA), which makes it eligible for GSA (General Services Administration) Schedule and other federal procurement contracts.
Tripp Lite PDU Monitored 120V 20A 5-15/20R 8 Outlet L5-20P Horizontal 1URM TAA - 16 x NEMA 5-15/20R - 1U Horizontal Rackmount - RoHS, TAA Compliance
Tripp Lite 3-Phase PDU Monitored 10kW 200/208/240V 42 C13; 6 C19; L21-30P - Monitored - NEMA L21-30P - 6 x IEC 60320 C19, 42 x IEC 60320 C13 - 230 V AC - Network (RJ-45) - 0U - Vertical - Rack Mount - Rack-mountable - TAA Compliant - TAA Compliance
Bypass PDU Recommended for Maintaining Continuous Power During UPS MaintenanceKeeping mission-critical data center equipment operating at its optimal level often means scheduled maintenance. But what if you are unable to afford the costly downtime involved in powering down for regular upkeep? This 220-240V 13A single-phase hot-swap PDU works in conjunction with your UPS system to keep everything running 24/7/365. It allows you to manually transfer connected equipment to utility power via the PDU’s bypass switch, permitting maintenance or equipment replacement with no interruption of performance.Features Dual Inputs and a Manual Transfer Switch for Uninterrupted OperationThe PDUBHV20B features two C20 inlets that connect to separate UPS and utility input power sources with user-supplied power cables or the included cables. The manual transfer switch allows PDU output power to flow from either input. Flip the switch to Bypass to replace the UPS and flip back to Normal once the maintenance or UPS replacement is complete. Equipment connected to the four BS1363 outlets will continue to operate without interruption.Optional ECO Switching Feature Enables Cost-Cutting Power SavingsBy enabling the ECO power saving feature, you can power off a single bank of three controlled BS1363 outlets all at once when the device connected to the master BS1363 outlet is powered off or goes into a low-power consumption mode. Mounts into 2U of Rack Space or on a WallUse the included mounting hardware to install the PDUBHV20B’s all-metal housing inside a 19-inch rack. Because the rack PDU (rPDU) 56.1-millimeter height is larger than 1U in an EIA-standard rack, you will need to mount the unit into 2U of space. You may also use the mounting brackets to secure the PDU to a wall.
MFR: Netgear, Inc
Qty: 1
Part #: GS105NA